Cellar Door Installation Before & After Photos

Click on a photo to enlarge.

Installation of Custom Angle Bulkhead and Foundation Repair

This bulkhead was a steel door mounted on concrete which was at or below grade.  In order to raise the grade, form boards were built and concrete poured to raise the foundation by approximately 6 inches.  The concrete for this job was mixed by hand.  Because all of our doors are custom built, we can adjust the height of the door accounting for the increase in the foundation.  When form boards were removed, foundation plates and the new bulkhead were installed.  The door and foundation plates come standard with red-oxide primer.  We recommend painting with a high quality, oil based paint.  

Installation of Angle Door with Foundation Plates in Bow, NH

This Bow, NH customer had a bulkhead cellar door that was leaking and rusted. They decided to give us a call to asses the issue. 

 

The Fix:  We removed the rusted door and installed a new custom designed bulkhead that increased the height by several inches.  Foundation plates were used to cover edges of concrete foundation to protect concrete from ice and snow and also provides a level surface to install the new bulkhead.  

 

 

Total Before & After Sets: 2

our service area

We serve the following areas

Our Locations:

The Bulkhead Man & Sons LLC
12 Gavin Rd
Mont Vernon, NH 03057
1-603-259-4457
Top